As part of the construction of a new TGV high-speed rail line between Nîmes and Montpellier (France), hydraulic works were necessary to ensure the continuity of the hydraulic protection along the Vidourle River.
See how we protected the railway bridge against erosion.
#engineeringabettersolution #civilengineering